First CTVs launched from Strategic Marine’s new shipyard
The new 27m vessels, built to the company’s Stratcat 26 design, are being delivered to WEM Marine.
WEM 5 and WEM 6 have been designed to meet the operational requirements of UK and European waters where they will go into service. The vessels are powered by two Caterpillar C32 engines driving fixed pitch propellers.

When fully operational, 24 technicians and six crew can be comfortably accommodated onboard and personnel transfer to the wind turbines is facilitated by a patented active fendering system. WEM 5 and WEM 6 are sister vessels to two CTVs delivered to WEM Marine in the summer of 2021 and all four have been delivered on schedule and to budget, despite the challenges of the global pandemic.
Both vessels recently completed their sea trials and delivered speed exceeding 26 knots.
RINA Services provided classification services.
Strategic Marine recently acquired the fixed infrastructure as well as the lease of the shipyard at 5 Benoi Road and has completed the lease transfer from JTC Corporation, the lessor of the shipyard.
The facility represents a significant upgrade in Strategic Marine’s offering to its clients and some notable features include a 5,000 DWT Dry Dock (L: 105M x W: 18.5m x D: 8m) and a 6,000 DWT slipway.
The larger facility will allow Strategic Marine to scale up shipbuilding capabilities and expand its product offering to deliver larger vessels and execute vessel repair/maintenance services. Its ship building, repair and maintenance capacity will also be greatly increased with a 105m long dry dock facility and a slipway.