Wärtsilä hybrid solution for new Isle of Man ferry

Importer
The new IOMSP ferry, the Manxman, will operate with a comprehensive range of Wärtsilä solutions. (© IOMSP & Houlder)

The Wärtsilä scope of supply includes Wärtsilä 31 engines, electrical and automation including Wärtsilä’s Low Loss Concept (LLC), the energy storage system, and propulsion machinery including transverse thrusters. The equipment is scheduled for delivery to the yard during the latter part of 2021.

The scope of supply also includes the NACOS Platinum integrated navigation system, along with a newly developed, ground-breaking Bridge Console Design and an Aquarius UV Ballast Water Management system.

Wärtsilä has worked closely with the owner to develop a customised integrated solution based on the ship’s operating profile and customer-specific requirements. Reliability, efficiency, and low operating costs were key considerations.

“We have selected Wärtsilä as their solution brings notable advantages in terms of system integration and operational optimisation. It will also have the flexibility to take advantage of alternative future fuels as they become available. Wärtsilä has the experience to deliver a state-of-the-art bridge to propeller solution, along with the track-record needed for this complex newbuild project,” says Mr Jim Royston, Fleet Operations and Project Manager at IOMSP.

“The Hybrid solution, combining highly efficient engines and energy storage, is increasingly being seen as a practical means for meeting today’s environmental and operating challenges. This solution lowers emission levels and extends the time between engine overhauls, and is an effective future-proof model for ship owners,” says Karl Hinks, Sales Manager, Wärtsilä Marine Power.