Wärtsilä to provide electrical package for research vessel
The Meteor IV project has been contracted by Germany’s Federal Ministry of Education and Research, and the ship will be constructed by the Meyer-Fassmer-Special Shipbuilding Division consortium. The Wärtsilä order was included in its order book in September 2022.
Wärtsilä’s scope of systems and services for the 125-metre vessel comprises the design integration of all the electrical systems. The company will also provide the switchboards, the electrical distribution and drive systems, generators, as well as the entire lighting system and special systems for energy supply. The vessel will be outfitted with a truly integrated Navigation and Automation system – NACOS Platinum. Furthermore, Wärtsilä will deliver the bridge consoles and solid state radar technology.
Wärtsilä will be involved throughout the entire project. This will include detailed design work during the engineering phase, and will continue with all the appropriate installation and connection requirements at the manufacturing shipyards in northern Germany. Wärtsilä will also take responsibility for commissioning of its scope of supply, as well as the entire cabling system.
When delivered, the Meteor IV will carry out international and inter-disciplinary missions, focusing on climate and environmental research in the Atlantic waters.
Our much-missed Germany correspondent, Tom Todd, featured the research vessel project in 2020.