Boiler plant order boost for Parat Halvorsen
Two of the ships will be built and are scheduled from Vard Vung Tau in Vietnam in 2015 and 2016 for the ship owner, E. R. Offshore. The other two ships will be built at Vard Aukra shipyard for the ship owner, Nordic American Offshore, and both are scheduled for delivery in 2015.
For Tersan shipyard, the boiler plants will be delivered for two freezer trawlers which will be equipped with Parat combined oil fired and exhaust gas boilers, type MCS, to comply steam production for the vessels’ fishmeal and fish oil factory.
Both freezer trawlers are designed by Skipsteknisk in Norway and will be of ST-116 and ST-118 design. Both trawlers are scheduled for delivery in 2016.