ST Marine to build two tugs for OSG

Importer

The tugs will be built over 16 months at VT Halter Marine’s Moss Point Marine shipyard with deliveries expected in the second and third quarters of 2011. Measuring 42.8m by 11.6m each, these two state-of-the-art tugs will be used to perform articulated tug barge (ATB) services, transporting refined petroleum products coastwise within the US and will have all the necessary capabilities to operate in full ocean service.

Last year, VT Halter Marine was awarded contracts from OSG to undertake the outfitting and commissioning of two 350,000 barrel barges which are the largest ATBs built by VT Halter Marine.

Tags: Tugs