Equipment

EQUIPMENT

GE Power chooses Corvus energy storage

The 250m3/h Trojan Marinex BWT requires only a 3sq m footprint as a result of the inline lamp driver design EQUIPMENT

Inline lamp drivers slash Trojan BWMS footprint

Two 17,5000dwt chemical tankers to be built for Stenersen will feature WE Tech permanent magnet shaft generators EQUIPMENT

PM shaft generators for Stenersen tankers

The Hydrocurrent waste heat recovery, based on the organic Rankin cycle, was installed on 'Arnold Maersk' in April EQUIPMENT

Debut verifies Calnetix waste heat recovery

Three new tankers being built for Maersk Tankers will be equipped with Wärtsilä BWMS EQUIPMENT

Wärtsilä BWMS for Maersk Tanker newbuilds

EQUIPMENT

First installation for Belco multi-engine scrubber

The Ballast-Check 2 PAM Fluorometer provides an indication of treated ballast water quality within a minute EQUIPMENT

WSS to market ballast water sampling unit

Stena Line has ordered a second Torductor Marine unit for the twin skeg freight ferry 'Stena Scotia' after a successful trial EQUIPMENT

ABB debuts torque monitor on Stena ferry